9.20.2014

Plumbing, Electrical and The Blower Door Test!

Even though a lot has happened on the house in the last couple weeks, it's been in smaller bits and pieces that I hadn't gotten good pics of. 

Let's see where I left off...

Wow. I guess a lot has happened! 

All the plumbing and electrical "rough-in" got completed. Here's some interior shots of the framed walls:


The timber frame portion and ceiling of the front porch got installed! Still needs the metal roof, and the actual porch/deck part will wait (I think) until some dirt gets moved around. 

Todd installed the ERV system, which stands for energy (or enthalpy) recovery ventilator. Basically it's a fancy ventilating system that always brings in fresh air and exhausts the stale air but captures the heat (or cold - depending on what you're trying to do) at a high efficiency to use with the fresh air. In other words, it moves the air (always fresh) throughout our space; and it manages the humidity. and it seems like a slick way to move air around without a typical furnace, dusty air ducts, uncomfortable air movement. It runs at a really low rate of air flow all the time, and consists of small plastic ducts that run through the stud walls and shouldn't collect dust and pollutants the way typical metal ducts do. We shall find out how it all works once we're living in it for awhile!


It's pretty much a necessity for a tightly sealed house, from the research I've done.  Which brings me to... 

The blower door test! This is one of those things that I and our builder kind of geeked out on. So hopefully I don't bore you with the following...! Feel free to tune out and skip to the end!

It's a way to measure how air-tight your house is and if done before drywall is complete, it provides a way to find leaks that can be sealed before the construction is done.  In fact, it's such a key piece of energy efficient construction that air-tightness is a major requirement of certification under the "Passive House" standards that are modeled after Germam energy efficient construction methodologies.  Though I did a lot of research and am quite familiar with several different energy efficiency models, such as LEED, passive solar design, Energy Star Homes, and Passive House, we chose not to follow one particular subscribed path in order to receive any official certification. Rather I used a variety of design principles and bits and pieces of each, as well as the help of an energy consultant out of Denver. The Passive House standard requires a strict air tightness measurement of 0.6 ACH @ 50 pascals (air changes per hour at a particular pressure).  The Energy Star program requires between 3 and 6 ACH, depending on climate zone. I decided that I would be quite happy with a target of 1 ACH, so the energy model and the HVAC system were designed to that goal. 

Why is air tightness so important, you ask? What about moisture build up, fresh air, letting the home breathe, etc? The way I see it (after living in several very leaky homes and wasting a lot of electricity to send heat right out the cracks around a poorly installed and sealed window, or right through poorly insulated floors and walls), I'd much rather have control over the ventilation and heating/cooling of the space rather than letting the leaks decide! Hence the ERV system discussed above. 

Though it seems so important to me, our builder could only find one guy locally that has the equipment and know-how to do blower door tests. He's on the verge of retirement, but Todd hired him to come do the test and share some of the knowledge so that Todd (and maybe me some day....future career in energy consulting?) can take over being able to provide such a service.  

Here's some pictures of the process. Preparing the blower door frame:
Getting the fan into place:

He prepped the system, turned it on and we watched eagerly to see where the numbers came in.  The gauge measures cfm's of air flow, which then gets plugged into a formula using the volume of the house to get an ACH number, so we couldn't tell at first where we were at in relation to our goal. The tester was baffled by the readings on the gauge because it didn't at first seem to be reading properly. He even opened a window to see how it would affect the readings, and the numbers jumped accordingly. Then he shut the window again, and basically said the readings were so low, he wasn't sure it would even calculate properly. Sure enough, when he plugged it into the computer, the program said the cfm figures (~60 cfm @ 50 pa) were too low to calculate ACH.  He tried a few different numbers that were artificially high, and it accepted ~75 cfm, which translated to 0.15 ACH, meaning we were nearly at 1/10th of our goal! Wow! 

In his 30 years of doing blower door tests, he had NEVER seen a house come in that low, by a lot! Todd also testified that we had blown away (no pun intended!) the air tightness records that he had encountered among his SIP (structural insulated panel) colleagues!  

Todd and I were pretty happy about the results for sure, but to rain on our own parade a little bit, it was so low that we both actually questioned the accuracy of the test. Was it done right? Did we miss something? Todd had definitely gone to great effort to ensure all leaks were sealed and that the high quality windows and doors I selected were installed properly. BUT, he didn't think he had done anything really out of the ordinary, and it is considered difficult to construct a house under 1 ACH. Also, to be clear, air tightness and blower door tests are by far not the only measure or indication of energy effiency or good quality, etc.  (If you're still interested in all this and not yet bored by it, see the following for an in-depth discussion about this particular topic: http://www.buildingscience.com/documents/insights/bsi-053-just-right-and-airtight).  There are plenty of people that don't believe that tighter is necessarily better; and/or that too tight can be problematic. Hence the "build it tight AND ventilate right" jist of the linked article.  We're hoping that we got both pieces of that puzzle right!  

And, because of our doubts with the test, we are actually having it redone next with a smaller fan that will hopefully give us a more accurate reading to at least have an accurate number to brag about! 

Enough for now. Thanks for sticking with me. More fun visuals next post (hint: we've got drywall in place - it's really starting to look like a house)!

9.10.2014

When a 3 year old is quiet...

I was getting ready this morning when I realized that the house was suddenly, oddly quiet.  I hadn't heard anything from my three year old the last several minutes. 

Before I even turned the corner, I knew I would find something disastrous, messy or entirely amusing.

Thankfully it was the latter!

Who knew I even owned lipstick?! Somehow Marlin found it (again - yes one other time he had put it all over his mouth). This time he had even more fun with it - rubbed it all over both cheeks, mouth and both sides of both hands!


9.04.2014

10 years and counting

It's been a great first ten years of marriage. Hard to believe how fast it's gone, and looking forward to what the next ten years will hold for us! 

Happy Anniversary, Dear Husband! 

9.03.2014

Rest in peace, Jack

We are sad to share the news that Jack is no longer with us. We had to bury him on Monday, and we are still somewhat shocked by how fast he went from being just fine to no longer with us!  


It started with some bleeding in his mouth, and a little limping/instability about a week ago. The vet found several masses/tumors/concerning spots, suggesting cancer that they biopsied as well as an xray that showed masses (likely cancer) in the lungs. They scheduled us for a follow up to find out the results today.  

We never thought then that he wouldn't make it to today! He just got progressively worse over the weekend, and by Sunday morning he stopped eating and drinking and could no longer even get up. It was clear very quickly that he was shutting down and by Monday morning, we decided it was time to stop his suffering (and ours from watching him)!  

I did find out today that one spot they biopsied indicated hemangiosarcoma, and though the vet wasn't able to explain much, some googling indicates that it can indeed be a cancer that spreads rapidly via the blood vessels and can kill a dog within several weeks or less, often not discovered until it is too late to do much. Even when it is discovered early, the prognosis isn't great. I guess it was comforting to know that we couldn't have done much, and are thankful that his suffering (and ours) seemed to be rather limited.  Much preferable to watching him suffer from cancer over several months and/or us having doubts about when it was time to put him down.


We were glad that it was Labor Day, so Ryan didn't have to work. We were able to spend a beautiful (but sad) day at our land, hiking around in search of a resting place and then burying him beneath a nice oak, not too far from our new house, so he can always be close by.  

We miss him a lot but are sure glad that we have a three year old in the house the past few days. One of the first questions several different people have asked us is how Marlin is handling it and/or if he gets it. He's made a few comments about missing Jack, and had a few (kind of fake-y) 'crying' faces but mostly I think he's imitating and not fully grasping everything.  And also, he's three. Even if this is experience is helping him understand death, his emotional (im)maturity and ability to think simply and keep things light and goofy is actually quite refreshing and welcome in our gloomy states! 

It's quite a hold those four-legged friends can have on our hearts....! 

8.27.2014

Roofing, Siding, and the Fair!

They've got the roofing done (with the exception of some of the trim and ridge pieces), and they've moved on to the siding. 

For the roof, we always knew we wanted metal- it's more expensive but much longer lasting (like, forever) than shingles and it's much more fire safe, which is a legitimate concern, considering it's our primary natural disaster threat. 

We really wanted a dark bluish gray color, but the options available left us with dark gray or this blue that we went with:

We did not come by the decision easily, seeing as the roof will (hopefully) last a long time, and will hopefully not be a color we get sick of. Gray was a little safer, but we liked this blue color with the other finishes/colors we have planned for the house. On sunny days, it looks a lot more blue, but in some light it's perfect as in these cloudy day photos: 


These storm-cloudy skies were kind of the color we were after.

The guys are also busy putting up the siding! We decided on fiber-cement siding in a board and batten style. We were almost convinced to use a composite wood siding product, but at the last minute decided we preferred the fire-resistive nature of the fiber-cement, and it's also virtually maintenance-free, and the cost came out virtually the same as the alternative we were considering. We both really like stucco and would have loved to use that, but it became cost-prohibitive and while it would have made sense with straw bale, it just wasn't as practical with our SIP panels. 

Below the board and batten, which will get painted, we are using a corrugated metal wainscot in dark gray. It's not installed yet, but you can see here where it will start below the siding panels:
This shows the panels up, but no battens on yet. Also, it will get painted but it's going to be kind of a khaki color, lighter but probably not too different from what you see! 

The electrician and plumber have continued to stay busy doing their parts. The ERV system (the ventilation) was delivered, and Todd will soon start installing that. (More on an ERV later.) 

Also....last Friday we took Marlin to the fair! He got to go twice- Aunt Michelle and cousin Abby took him already but it was fun to go again and watch him enjoy the animals and the  rides!
A llama!



And...just when we were getting ready to leave, we saw that they were holding a special event that was drawing a crowd....pig wrestling!!! 

 

8.17.2014

In other news...

I've been pretty caught up in the house as you can imagine since that's all most of my recent posts talk about. And Ryan's been busy with all his various employment endeavors these days. 

But there is another kind of big, important thing happening in our lives that I really haven't blogged about.  (And I feel a little silly to realize that it's possible a couple of you quiet followers may not even know...) The tiny person growing inside of my belly is getting bigger all the time and will SOON be here! The October 6th due date is really sneaking up on us! Yes, I'm really almost 33 weeks along already.  

(What?! When did that happen?!)

And if you hadn't heard, your next question is likely - is it a boy or girl? I actually have NO idea. We chose not to find out at the 20-wk ultrasound when it would have been easy to learn. And though I thought maybe one of the nurses gave it away at a different appointment, apparently I was wrong because it is not in my chart, and the only person that supposedly knows is the ultrasound tech.  Marlin seems to think it's a baby sister- from the first discussion with him about it, he called the baby a she and talks about sharing his toys with "her." But we keep reminding him that it could be a brother or a sister! 

Yesterday, Ryan and I (reluctantly) attended a childbirth education class at the hospital. Even though we've been through it before, I was glad to learn about this specific hospital's protocols, the labor and delivery nurse' opinions and to see the facilities.  

But it also made it a little more real all of a sudden - which is probably for the best since baby time is fast approaching! (I am NOT ready! And no, our house will NOT be done before baby comes. But that's okay. It just is what it is!) 

Last weekend we took a trip to Pierre for a family wedding. It was fun to watch Marlin dancing and playing with his cousins all weekend. 
He got to dance with the "white bride" AND the "green bride" (the bride's twin sister was maid-of-honor wearing green)!

Then on the way home from Pierre, we detoured to the ranch to experience a bit of harvest. Marlin (and I) got to ride in the combine and we also got some belly pics (finally) in the middle of a ripe wheat field! 

Credits to Ryan for his photog skills:

(With a growing belly and surrounded by gluten! :) ~32 weeks here.)




8.14.2014

Progress progress

A lot has been happening with the house! I actually don't have any pictures really of the recent stuff, but here's what's been happening:
The stud walls are all framed- including a big section of wall that we made them move! I just wasn't seeing on paper or in my mind's eye the fault in how we had it designed and dimensioned until he actually had it framed. But once it was up we realized that moving the wall dividing our kitchen and bathroom just a foot would make all the difference in our kitchen and dining space!  I was a little stressed about even asking him to redo all the complicated framing that went into that section of wall, but thankfully he understood and agreed...and of course we will pay for it, but have no regrets on that decision. 

That's been one of the hardest parts of this whole process is making decisions and realizing that we will be living with them for a long time - and realizing that we wish we could change some of the things we've already decided, even though we haven't even moved in!

Luckily it doesn't take too much to remind myself that this is a beautiful house that we are so blessed to be able to build on a beautiful piece of land that we can't wait to live on. When it's all done and we're moved in, there will certainly be things we wished we did different, places we wish we had spent more money and things we wished had spent less on, but we will still be so blessed!  (And not everything's For Ever...we can still redo or upgrade as we go, as I'm sure we will!) 

Now that the walls are framed, they're onto plumbing and electrical! All the practical stuff that makes modern day living pretty convenient! 

The plumber was "roughing in" all the venting and piping. And I also did a "walk-through" with the electrician to determine where all the lights get switched from, where all the outlets go, etc. (some of those decisions were surprisingly hard!...but again, once were in, I'll get used to whatever we've got.) presumably they got a lot of the wiring for all of that installed once I left. 

Todd and his guys got busy starting to install the exterior finishes while the sub-contractors are busy inside the house! They got part of the finished metal roof installed after I left this morning, so I will be anxious to see that when I go back out! 

All for now. I'll leave you with a fun pic of Marlin from a rainy day last week on site. He was in heaven stomping in the mud and playing with his trucks!