7.15.2014

Exterior walls done...and a roof!

Finally a roof! Because of the way the timber frame and sip panels get built, the finish ceiling gets put on before the roof. And Ryan and I were a bit picky about the wood ceiling we wanted...nothing too out of the ordinary, but not available locally prefinished.  As a result, we had a few different evening sessions finishing the boards with stain/sealer.  Thanks to the Julians, who all helped with some bit of staining or watching Marlin, it went quite a bit quicker than it might have.

Nonetheless, ceiling delays, coupled with a few other typical construction delays including some ill-timed thunderstorms, had us very eager to get the roof on so all that rain (and hail) would stop pouring into our house!  Luckily things dry out quickly here, otherwise I'd really be worried about trapped moisture.  

Finally today, the last roof panel got set.  The garage roof still needs a little work; and nothing's fully waterproofed yet but it's a lot better than it was. Pictures to catch you up to today:

The garage:
Where the woodstove/hearth is going to go:

The pine ceiling (square cut; no V-groove!) getting installed:

During one of the rainstorms that funneled lots of water right into the house along the walls (just had to remind myself that there was no point worrying about it -it's just "construction moisture" as our builder calls it  [as if calling it that means it can do no harm!]):

The clerestory walls are in place:

One roof panel getting lowered into place:


And from today- all the SIP panels in place:





Some cool patterns from where the garage still needs sheathing:
And Marlin playing happily in the dirt with his machines:
Me and Marlin watching the progress:

Lastly, I'll leave you with one of those cool but fleeting moments that happen during construction (like a naked timber frame).  Once the pine ceiling was on, but before the roof was on top of it, my eye caught sight of some of the knots in the wood.  Where there were large knots, which apparently are translucent, they glowed almost neon red as the sun poured through! 

As usual, the camera doesn't do it much justice, but it was a cool effect to have all these glowing reddish spots dotting our ceiling:

7.10.2014

Walls and a Denver trip

Like I said last post, a lot has happened since the frame. The panel walls all got installed around the frame!

First panels in place:
(Don't ask what's going on with my almost-3 y.o. in this picture) Ryan is getting a feeling for the view from the little loft nook:


Then we left for 4th of July weekend in Denver! Once again, spent a good chunk of my birthday in the car, as is the pattern. But pulled up behind this car on our way out of town:

And had this quite a bit of the way which made for quiet, talk time for Ryan and I:
Had lots of fun with G.G. Bell (great grandma), and LOVED all the attention from his great aunts and goofy uncles:
The highlight of Marlin's weekend, playing in the "pits" (aka sand pit at a nearby playground):


7.09.2014

Timber Frame!

I can't keep up. Got behind with the posting in the last two weeks and a lot has happened! 

Mainly and most exciting is the timber frame was raised! 

First "bent" going into place. That little triangle at the top is where a wee little loft is going! 

Next bent floating into place:
View from below:
Cross beams connecting them:


West bent going in:

Last major cross beam going in; then all the "purlins" and various connectors, "haunches" and loft pieces still to come:


I took lots more of the "finished" naked frame; more pics to come.

Also walls are already up around the frame and garage is mostly built so we've nearly got a roof on it! 

But now I'm headed out to the site to put a teensy bit of "sweat equity" into the house.  We're staining the tongue and groove wood ceiling that gets installed before the roof panels go on! 

Here's a little Marlin to leave you with: