7.10.2014

Walls and a Denver trip

Like I said last post, a lot has happened since the frame. The panel walls all got installed around the frame!

First panels in place:
(Don't ask what's going on with my almost-3 y.o. in this picture) Ryan is getting a feeling for the view from the little loft nook:


Then we left for 4th of July weekend in Denver! Once again, spent a good chunk of my birthday in the car, as is the pattern. But pulled up behind this car on our way out of town:

And had this quite a bit of the way which made for quiet, talk time for Ryan and I:
Had lots of fun with G.G. Bell (great grandma), and LOVED all the attention from his great aunts and goofy uncles:
The highlight of Marlin's weekend, playing in the "pits" (aka sand pit at a nearby playground):


7.09.2014

Timber Frame!

I can't keep up. Got behind with the posting in the last two weeks and a lot has happened! 

Mainly and most exciting is the timber frame was raised! 

First "bent" going into place. That little triangle at the top is where a wee little loft is going! 

Next bent floating into place:
View from below:
Cross beams connecting them:


West bent going in:

Last major cross beam going in; then all the "purlins" and various connectors, "haunches" and loft pieces still to come:


I took lots more of the "finished" naked frame; more pics to come.

Also walls are already up around the frame and garage is mostly built so we've nearly got a roof on it! 

But now I'm headed out to the site to put a teensy bit of "sweat equity" into the house.  We're staining the tongue and groove wood ceiling that gets installed before the roof panels go on! 

Here's a little Marlin to leave you with:



6.24.2014

Cistern, Septic progress, and timber frame assembly!

Here's the spot under our garage where the cistern/root cellar was placed.

The crane in action getting ready to loft the cistern and swing it into place:
Marlin and our contractor's son watching the action; the cistern on the right being floated across to set in place:

Cistern in place, with some clean gravel and dirt filled in partway around it. 

And the timber frame pieces being assembled flat on the floor deck:


6.19.2014

Basement enclosed

[sorry for the delay in posting this. I typed it up last Thursday and thought I posted it but i guess it didn't actually "publish."]

The wall support and trusses where the stairs come down were installed.  The left opening is the bottom of the stairs, the right hand side is a door opening for storage access to below the stairs.
 
The windows were delivered.  We went with Alpen high performance windows out of Denver. They have better insulation values and less air infiltration than any other windows we could purchase locally, so we'll be anxious to see how they perform once they're actually installed. They are "triple pane" with a suspended film in between two pieces of glass for two argon filled air chambers.  

Here's the hole that needs to be filled in for the garage floor.  Once we saw how much depth we have, we decided to buy a cistern to set in under there.  It will likely function as cold storage, with a hatch door through the garage floor, but it might also come in handy for an actual water cistern someday if we ever have problems with the well, or want to store rain water or something. It also helped us fill that space since we will be close on how much dirt for fill we have.

And the sub-floor of the main level was put in, creating a roof over the basement.  Here's Ryan standing in our future living room, checking out the view.  I think he's going to wish it was a glass house.  Once the walls are up and windows installed, the views will feel much more restricted compared to this (still not bad though - I ain't complainin'!): 

Showing the panorama from the living/dining space.  Hard to tell in the pic, but you can see the creek down there! (And hear it too)